For full functionality of this site it is necessary to enable JavaScript.
EMIN.ASIA
0
Product image

DOLANG DLWD-DJB02 Motor Transformer Maintenance and testing training system

ModelDLWD-DJB02
Warranty12 months
Contact
Secure Checkout
Quality Engagement
Easy change and return
Delivery Available

Technical Parameter

● Total dimension : 1950×700×1500mm

● Input power : three-phase,five-wire 380V±10% 50Hz/60Hz

● Output power : leakage protection(action current≤ 30mA), overcurrent protection,fuse protection, AC220V safety terminal isolation output, AC24V safety terminals isolation output,DC220V safety terminals isolation output

● Capacity : < 1.5KVA

Datasheet


Overview

●DLWD-DJB02 Motor Transformer Maintenance and Test Training System is the traning platform for remove,rewind,assembling,test,data analysis and other skills training of single-phase transformers,single-phase capacitor induction motor,three-phase squirrel cage induction motor and separately excited DC motor etc.

● The equipment is equipped with three-phase AC adjustable power supply, DC power supply, DC measurement instrument, AC measurment instrument & digital multi-function wattmeter,Motor power supply and test instrument. Beside the above instruments, there are motor inserting tools, Manual digital winding counter.

Stay Updated with Offers

Get exclusive volume discounts, bulk pricing updates, and new product alerts delivered directly to your inbox.

By subscribing, you agree to our Terms of Service and Privacy Policy.

Quick Support

Direct access to our certified experts